To read this content please select one of the options below:

Managing subcontractor supply chain for quality in construction

Khalid Karim (School of Civil and Environmental Engineering, University of New South Wales, Sydney, Australia)
Marton Marosszeky (School of Civil and Environmental Engineering, University of New South Wales, Sydney, Australia)
Steven Davis (School of Civil and Environmental Engineering, University of New South Wales, Sydney, Australia)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 1 January 2006

11226

Abstract

Purpose

To provide a decision support tool for long‐term management of subcontractor supply chain for achieving better quality in construction.

Design/methodology/approach

Defects on three construction projects are investigated through direct observation, document analysis, and interviews. A method to analyse and present defects information as an aid to decision making in relation to subcontractor supply chain management is proposed, and its application is illustrated by using the information obtained from the study.

Findings

The importance of managing the subcontractor supply chain to reduce the incidence of defects is established. The nature and extent of the defects, along with what caused them, are discussed. Method for conversion of raw data into a decision support tool is presented.

Research limitations/implications

The data collection method was limited in that it was not based on continuous full‐time observation. Such presence by independent observers for full duration of the project would provide more accurate information.

Practical implications

A useful tool for the construction industry in view of the fact that most of the construction work is now done by subcontractors and the head contractors primarily act as project managers.

Originality/value

The concept of using Pareto analysis/histogram for managing quality has been around for a considerable period of time. This paper converts it into a more efficient and useful decision support tool.

Keywords

Citation

Karim, K., Marosszeky, M. and Davis, S. (2006), "Managing subcontractor supply chain for quality in construction", Engineering, Construction and Architectural Management, Vol. 13 No. 1, pp. 27-42. https://doi.org/10.1108/09699980610646485

Publisher

:

Emerald Group Publishing Limited

Copyright © 2006, Emerald Group Publishing Limited

Related articles