Emerald Login
   

Welcome guest



Engineering, Construction and Architectural Management
Browse
User Guides
Online Access
Journal Information

Engineering, Construction and Architectural Management


Volume 11 Issue 3

Published: 2004 | Start Page: 150

Icon Key:   Icon: Requires login or subscription. Requires login or subscription   Icon: Backfiles. Backfiles   Icon: EarlyCite. EarlyCite

Articles

Articles
Article No: Article Information:
845827 Evaluating engineering consultants' general capabilities during the pre-selection process – a Hong Kong study
S. Thomas Ng, Lai-Kit Chow (pp. 150-158)
Keywords: Consultants, Hong Kong, Selection
ArticleType: Research Paper
Icon: Requires login or subscription. View HTML | View PDF (182 KB) | Reprints & Permissions
845828 Balancing fee and quality in two envelope fee bidding
Derek S. Drew, Sandy L.Y. Tang, Christine K. Lui (pp. 159-175)
Keywords: Consultants, Fees
ArticleType: Research Paper
Icon: Requires login or subscription. View HTML | View PDF (102 KB) | Reprints & Permissions
845829 An open framework for corporate strategy in construction
Charles Y.J. Cheah, Michael J. Garvin (pp. 176-188)
Keywords: Construction industry, Corporate strategy
ArticleType: Research Paper
Icon: Requires login or subscription. View HTML | View PDF (197 KB) | Reprints & Permissions
845830 Total quality management in Australian contracting organisations: pre-conditions for successful implementation
Peter E.D. Love, David J. Edwards, Amrik Sohal (pp. 189-198)
Keywords: Australia, Change management, Construction industry, Organizational culture, Total quality management
ArticleType: Research Paper
Icon: Requires login or subscription. View HTML | View PDF (180 KB) | Reprints & Permissions
845831 Downtime model development for construction equipment management
Madhav Prasad Nepal, Moonseo Park (pp. 199-210)
Keywords: Construction industry, Costs, Production downtime, Roads
ArticleType: Research Paper
Icon: Requires login or subscription. View HTML | View PDF (291 KB) | Reprints & Permissions
845832 Critical path determination by incorporating minimum and maximum time and distance constraints into linear scheduling
Alexandros Kallantzis, Sergios Lambropoulos (pp. 211-222)
Keywords: Construction industry, Real time scheduling
ArticleType: Research Paper
Icon: Requires login or subscription. View HTML | View PDF (860 KB) | Reprints & Permissions

Editorial

Editorial
Item No: Item Information
1491420 Editorial
Journal: Engineering, Construction and Architectural Management
Vol : 11 Issue: 3
Author(s): Ron McCaffer
Icon: Requires login or subscription View HTML