Welcome guest
Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system
Anis Chelbi, Nidhal Rezg, Mehdi Radhoui
Journal of Quality in Maintenance Engineering
2008
161 - 176
10.1108/13552510810877665
Emerald Group Publishing Limited
Please select from the following options:
View HTML
|
View PDF
(240 KB)
Purpose – The purpose of this study is to propose and model an integrated production-maintenance strategy for unreliable production systems producing conforming and non-conforming items.
Design/methodology/approach – The proposed integrated policy is defined and modeled mathematically.
Findings – The paper focuses on finding simultaneously the optimal values of the lot size Q and the age T at which preventive maintenance must be performed. These values minimize the total average cost per time unit over an infinite horizon.
Practical implications – The paper attempts to integrate in a single model the three main aspects of any manufacturing system: production, maintenance, and quality. It deals with the lot-sizing problem for a production system which may randomly shift to an out-of-control state and produce non-conforming units. The system is submitted to an age-based preventive maintenance policy. The effect of performing preventive maintenance on quality- and inventory-related costs is shown through a numerical example.
Originality/value – The paper proposes an integrated model that links EMQ, quality and an age-based preventive maintenance policy. It is shown that performing preventive maintenance yields reduction in inventory- and quality-related costs.
Inventory,
Lot size,
Preventive maintenance,
Quality
Research paper
www.emeraldinsight.com/10.1108/13552510810877665