To read this content please select one of the options below:

Significant causes of claims and disputes in construction projects in Saudi Arabia

Sadi Assaf (Department of Construction Engineering and Management, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia)
Mohammad A. Hassanain (Department of Architectural Engineering, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia)
Abdullatif Abdallah (Department of Management and Marketing, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia)
Ahmed M.Z. Sayed (Department of Construction Engineering and Management, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia)
Abdulrahman Alshahrani (Department of Construction Engineering and Management, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia)

Built Environment Project and Asset Management

ISSN: 2044-124X

Article publication date: 18 June 2019

Issue publication date: 20 September 2019

1376

Abstract

Purpose

Projects in the construction industry have been confronted with an unprecedented volume of claims, which negatively impact the construction business environment. The purpose of this paper is to identify and assess the major causes of claims and disputes, from the perspectives of three key stakeholders.

Design/methodology/approach

An online and paper-based questionnaire was distributed to a random sample of 250 professionals. Responses from 86 construction professionals were obtained. The significance index was employed to rank the factors and hence assess their relative significance. Results were analyzed from both the individual stakeholder, and collective perspectives. Test of agreement was also conducted.

Findings

The research found the following causes to be the most significant contributors to claims and disputes in Saudi Arabia: “change or variation orders due to new requirements from client” (78 percent), “variations in quantities due to new requirements from client” (74 percent), “delay caused by contractor” (74 percent), “design errors or omissions” (72 percent) and “inconsistencies in the drawings and specifications” (70 percent).

Originality/value

The research provides an in-depth assessment of the causes of claims and disputes, in the setting of a fast growing industry, in which strong performance is essential to continued success. Unlike several of the reviewed studies which reported “delay caused by the owner” or “delayed in payment” as a major cause of claims and/or disputes, the findings of the current study indicated that this cause was not the most significant. Instead, it was determined that the top causes of claims and disputes were attributed to all parties, including consultants, contractors and clients.

Keywords

Acknowledgements

The authors thank King Fahd University of Petroleum and Minerals for the support and facilities that made this research possible.

Citation

Assaf, S., Hassanain, M.A., Abdallah, A., Sayed, A.M.Z. and Alshahrani, A. (2019), "Significant causes of claims and disputes in construction projects in Saudi Arabia", Built Environment Project and Asset Management, Vol. 9 No. 5, pp. 597-615. https://doi.org/10.1108/BEPAM-09-2018-0113

Publisher

:

Emerald Publishing Limited

Copyright © 2019, Emerald Publishing Limited

Related articles