To read this content please select one of the options below:

Key indicators influencing the management of team integration in construction projects

Che Khairil Izam Che Ibrahim (Faculty of Civil Engineering, Universiti Teknologi MARA, Pulau Pinang, Malaysia)
Seosamh B. Costello (Department of Civil and Environmental Engineering, The University of Auckland, Auckland, New Zealand)
Suzanne Wilkinson (Department of Civil and Environmental Engineering, The University of Auckland, Auckland, New Zealand)

International Journal of Managing Projects in Business

ISSN: 1753-8378

Article publication date: 7 April 2015

2355

Abstract

Purpose

The purpose of this paper is to validate a list of key indicators (KIs) of team integration identified from construction management literature, identify the most significant KIs and provide suggestions on how to influence team integration, based on the opinion of an established construction peer group in New Zealand.

Design/methodology/approach

A literature review was conducted to identify and consolidate a set of KIs of team integration. Subsequently, a set of questions was designed to gain insight and opinion in terms of the significance and ranking of the identified indicators, as well as suggestions on how to influence the integration practice.

Findings

Analysis of the survey results showed that all relevant indicators have a strong influence towards determining the success of team integration in construction projects. The top-ranked indicators that contribute towards successful team integration are all relationship orientated as follows; single team focus on goals and objectives, trust and respect, commitment from top management, free flow communication and no blame culture. A framework for influencing these indicators of team integration is proposed which includes four elements: first, team formation; second, contractual model; third, teamwork principle; and fourth, operational monitoring.

Research limitations/implications

The findings are limited to practitioners’ perceptions who are registered with an established construction peer group in New Zealand.

Practical implications

The results of the study are expected to provide insight for construction practitioners to help them embrace team integration practice and, hence, provide both the opportunity and a platform to enhance and measure their team performance.

Originality/value

The paper recognises that while the process of integration is a result of a combination of many indicators, it further extends the team integration literature by providing insights into what are the dominant relationship indicators of team integration, and how to influence these indicators based on a proposed framework.

Keywords

Acknowledgements

The authors gratefully acknowledge the Ministry of Higher Education, Malaysia and Department of Civil and Environmental Engineering, The University of Auckland, New Zealand for providing funding to support this research study. Special gratitude is also extended to Peter Cunningham and Tim Warren, in particular, and New Zealand’s Construction Clients’ Group (CCG) members who responded and contributed their valuable input in completing the survey questionnaires. Those who indirectly participated in making this survey possible are also acknowledged with sincere thanks.

Citation

Che Ibrahim, C.K.I., Costello, S.B. and Wilkinson, S. (2015), "Key indicators influencing the management of team integration in construction projects", International Journal of Managing Projects in Business, Vol. 8 No. 2, pp. 300-323. https://doi.org/10.1108/IJMPB-04-2014-0028

Publisher

:

Emerald Group Publishing Limited