Availability forecast of mining equipment

Franco Jefferds dos Santos Silva (Department of Mechanical Engineering, Universidade Federal do Sul e Sudeste do Pará, Marabá, Brazil)
Herbert Ricardo Garcia Viana (Vale, Rio de Janeiro, Brazil)
André Nasser Aquino Queiroz (Vale, Rio de Janeiro, Brazil)

Journal of Quality in Maintenance Engineering

ISSN: 1355-2511

Article publication date: 10 October 2016

569

Abstract

Purpose

The purpose of this paper is to present a methodology for forecasting the availability off-highway trucks used in a fleet for large transport operations of ore and sterile rock from an open pit mine.

Design/methodology/approach

This methodology enables the estimation of the number of hours of preventive and corrective maintenance required, which are used to predict truck availability. The authors used historical data for the maintenance strategy based on the hours of operation.

Findings

These data are statistically analyzed to obtain the key quantities and statistical models required to project availability and to develop equipment replacement plans.

Originality/value

A methodology for forecasting availability to assets in open pit mining industry was implemented.

Keywords

Citation

Silva, F.J.d.S., Viana, H.R.G. and Queiroz, A.N.A. (2016), "Availability forecast of mining equipment", Journal of Quality in Maintenance Engineering, Vol. 22 No. 4, pp. 418-432. https://doi.org/10.1108/JQME-12-2015-0067