Capturing maturity of ICT applications in construction processes

Robert Eadie (School of the Built Environment, University of Ulster, Newtownabbey, UK)
Srinath Perera (School of the Built and Natural Environment, Northumbria University, Newcastle Upon Tyne, UK)
George Heaney (School of the Built Environment, University of Ulster, Newtownabbey, UK)

Journal of Financial Management of Property and Construction

ISSN: 1366-4387

Article publication date: 27 July 2012

942

Abstract

Purpose

Two main types of models are used worldwide in consideration of the impact of Information Communication Technology (ICT) processes in construction: capability maturity models (CMM) and e‐readiness models. The purpose of this paper is to review the structure behind the different models, their applicability to construction and indicate how organisations move between the levels in a CMM.

Design/methodology/approach

This study investigates the literature behind eight e‐readiness models and 53 CMMs.

Findings

The findings indicate 88 per cent of maturity‐based CMM models linked to five maturity levels, with the remainder using four. CMMs have common features: the process/application is described by maturity levels; Key Process Areas (KPA) provide the features to allow movement; and the levels are arranged and attained systematically, lowest to highest. Publication dates and trends indicate the rate of CMM publication is increasing (most in 2009), conversely, e‐readiness models are not (most published in 2004).

Practical implications

It is expected that the number of CMMs will increase; conversely, e‐readiness models may not. E‐readiness models have not been adopted by other industries and applications. However, CMMs, although initiated in software engineering, have progressed to incorporate construction models which cover processes as diverse as financial management and documentation. This suggests that a CMM is more applicable for applications such as e‐business in construction.

Originality/value

The paper significantly expands that of Man in 2007 who listed 22 CMM models. This paper categorises a further 31 models and indicates construction applicability, combined with a review of e‐readiness models for the first time.

Keywords

Citation

Eadie, R., Perera, S. and Heaney, G. (2012), "Capturing maturity of ICT applications in construction processes", Journal of Financial Management of Property and Construction, Vol. 17 No. 2, pp. 176-194. https://doi.org/10.1108/13664381211246624