On the Simulation Run Length: A Step towards Real Time Control in an FMS

Amit Garg (Bender Management Consultants, Arlington, Virginia)
Hsu‐Pin (Ben) Wang (Department of Industrial Engineering, State University of New York at Buffalo, Amherst, USA)

International Journal of Operations & Production Management

ISSN: 0144-3577

Article publication date: 1 September 1990

60

Abstract

In any real time control system, its scheduling and control policy should be reassessed every time the state of the system changes. In large and complex systems, this could be a self‐defeating goal. Implementing real time control in such systems would require an enormous amount of computation time. Determination of discrete time interval (simulation window length) is the main objective of this study. To implement and demonstrate this methodology, we selected a Flexible Manufacturing System (FMS) which approximates a dynamic job shop. The Expert Control System (ECS) developed in this study integrated programmes for different functions and employed multi‐pass simulation to determine the best scheduling strategy in the system. The simulation output is then subjected to Analysis of Variance (ANOVA) and Newman‐Keuls′ range tests to obtain a “good” simulation window length for different performance criteria of optimisation.

Keywords

Citation

Garg, A. and Wang, H.(B). (1990), "On the Simulation Run Length: A Step towards Real Time Control in an FMS", International Journal of Operations & Production Management, Vol. 10 No. 9, pp. 74-88. https://doi.org/10.1108/01443579010001979

Publisher

:

MCB UP Ltd

Copyright © 1990, MCB UP Limited

Related articles