To read this content please select one of the options below:

Preventive Maintenance in a Multiple Shift and High Volume Manufacturing Operation

David Osborne (MIS International, Michigan, and University of Detroit Mercy, Michigan, USA)
Shahram Taj (MIS International, Michigan, and University of Detroit Mercy, Michigan, USA)

International Journal of Operations & Production Management

ISSN: 0144-3577

Article publication date: 1 October 1993

151

Abstract

Shows how to implement a preventive maintenance (PM) system in a high volume manufacturing operation with a just‐in‐time environment. Determines the tasks that are performance‐coupled in a specific machine by using a simple flowchart. Computes for every component suitable for PM, earliest economic replacement time and earliest expected replacement time. Using a time graph, the PM is scheduled for components that are performance coupled in a specific machine. This procedure is straightforward and can be easily followed by plant floor personnel.

Keywords

Citation

Osborne, D. and Taj, S. (1993), "Preventive Maintenance in a Multiple Shift and High Volume Manufacturing Operation", International Journal of Operations & Production Management, Vol. 13 No. 10, pp. 76-83. https://doi.org/10.1108/01443579310045572

Publisher

:

MCB UP Ltd

Copyright © 1993, MCB UP Limited

Related articles