An Extended Model for the Joint Overhaul Scheduling Problem
International Journal of Operations & Production Management
ISSN: 0144-3577
Article publication date: 1 July 1994
Abstract
Deals with planning the maintenance scheduling of a group of non‐identical production units. Develops a realistic model for the joint overhaul problem by incorporating the cost of co‐ordination. The model selects overhaul schedules that minimize the average total cost of operation which consist of the cost of repairs, the cost of production, and the cost of co‐ordination. Proposes a new procedure for solving the problem. Lower costs are obtained for two examples from the literature which were solved using the proposed model.
Keywords
Citation
Duffuaa, S.O. and Ben‐Daya, M. (1994), "An Extended Model for the Joint Overhaul Scheduling Problem", International Journal of Operations & Production Management, Vol. 14 No. 7, pp. 37-43. https://doi.org/10.1108/01443579410062158