To read this content please select one of the options below:

Animating an integrated job shop/flexible manufacturing system

Chris Stylianides (Cyprus International Institute of Management, Nicosia, Cyprus)

International Journal of Operations & Production Management

ISSN: 0144-3577

Article publication date: 1 August 1995

1196

Abstract

Modern manufacturing facilities include conventional work centres as well as flexible manufacturing systems (FMSs). Discusses computer simulation software which simulates and graphically animates in real time an integrated job shop/FMS. The program interfaces a FORTRAN‐based simulator with a mainframe computer aided design (CAD) system which provides for 3‐D wire‐frame computer graphics and real‐time animation. The program also employs a batch‐oriented material requirements planning (MRP) system to provide daily updates of outstanding production centre loadings on a monthly planning horizon. Presents an example of an evaluation of an actual manufacturing facility.

Keywords

Citation

Stylianides, C. (1995), "Animating an integrated job shop/flexible manufacturing system", International Journal of Operations & Production Management, Vol. 15 No. 8, pp. 63-72. https://doi.org/10.1108/01443579510094099

Publisher

:

MCB UP Ltd

Copyright © 1995, MCB UP Limited

Related articles