To read this content please select one of the options below:

Advanced manufacturing system for automotive components production

Pacifico Marcello Pelagagge (Associate Professor, Faculty of Engineering, University of L’Aquila, L’Aquila, Italy)

Industrial Management & Data Systems

ISSN: 0263-5577

Article publication date: 1 December 1997

1336

Abstract

Presents the results of a pilot project on implementation of just‐in‐time (JIT) production for an automotive component (sleeve for synchronizing groups). Describes the old manufacturing system and outlines the related problems. Proposes, with the aim of reducing set‐up times and increasing flexibility, quality and logistic performances, a new advanced manufacturing system using JIT as an approach. Presents a summary of costs and benefits arising from the new system, outlining factors such as a total cost of $3 million and a lead time reduction of 60 days.

Keywords

Citation

Marcello Pelagagge, P. (1997), "Advanced manufacturing system for automotive components production", Industrial Management & Data Systems, Vol. 97 No. 8, pp. 327-334. https://doi.org/10.1108/02635579710195055

Publisher

:

MCB UP Ltd

Copyright © 1997, MCB UP Limited

Related articles