To read this content please select one of the options below:

Data acquisition from construction sites for tracking purposes

Samir El‐Omari (Department of Building, Civil & Environmental Engineering, Concordia University, Montreal, Canada)
Osama Moselhi (Department of Building, Civil & Environmental Engineering, Concordia University, Montreal, Canada)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 4 September 2009

1814

Abstract

Purpose

The objective of this paper is to develop a tracking and control system that automates the process of data collection from construction sites for fast and accurate measurement of work progress.

Design/methodology/approach

The proposed system integrates different data acquisition hardware and software technologies including barcoding, radio frequency identification (RFID), laser distance and ranging (LADAR), digital images, and a tablet PC as integrating media.

Findings

The paper briefly highlights the advantages and limitations associated with each technology, and presents a methodology that best utilizes these technologies in an integrated system. At the core of the developed system is its database, which is designed to organize and store data collected from construction sites in a way that supports the developed methodology in progress reporting.

Practical implications

The accuracy and timeliness of these reports are crucial for management teams to take corrective actions, if needed, so as to assist in delivering projects on time and within budget.

Originality/value

The paper presents the layout of an IT platform designed to facilitate automated data acquisition from construction sites to support efficient time and cost tracking and control of construction projects. The system presented is capable of capturing text, numerical and graphical data to report efficiently on the progress of a project.

Keywords

Citation

El‐Omari, S. and Moselhi, O. (2009), "Data acquisition from construction sites for tracking purposes", Engineering, Construction and Architectural Management, Vol. 16 No. 5, pp. 490-503. https://doi.org/10.1108/09699980910988384

Publisher

:

Emerald Group Publishing Limited

Copyright © 2009, Emerald Group Publishing Limited

Related articles