Study and analysis of maintenance performance indicators (MPIs) for LKAB: A case study

Aditya Parida (Division of Operation and Maintenance Engineering, Luleå University of Technology, Luleå, Sweden)

Journal of Quality in Maintenance Engineering

ISSN: 1355-2511

Article publication date: 2 October 2007

2097

Abstract

Purpose

The purpose of this case study is to identify and develop maintenance performance indicators (MPIs) for a mineral processing plant producing high quality iron ore pellets, as well as studying and analyzing the short plant stops and planned maintenance stops.

Design/methodology/approach

An action research approach was adopted for this study, with interactive process of interviews. The existing MPIs are analyzed and a set of MPIs are developed to measure the performance of balling area of the pelletization plant, where the effect of shorter stops in the process have been studied, analyzed and measured, and linked to the management's objectives. The utility of the MPIs are tested and validated within the framework of a multi‐criterion and hierarchical maintenance performance measurement (MPM) framework. The plant stop data of the plant were collected and analyzed for MPIs and for maintenance decision making. Some other criteria were also considered from a holistic, integrated and balanced viewpoint in the model.

Findings

This study resulted in identifying a set of MPIs for the operational level of the pelletization plant of LKAB, after analyzing the short plant stops and planned maintenance stops data, and the stakeholders' requirements. This study has identified nine MPIs at operational level or shop floor level that describe the status of plant and at the same time facilitates linking of plant performance with corporate strategy.

Practical implications

The approach used in the paper to study, analyze and develop MPIs, can be useful for plant managers and asset owners to select and develop MPIs that can describe the health status of their plant and asset and that also can be linked to the corporate strategy. The framework used to verify the multi‐criteria hierarchical framework can also be used by similar asset managers and infrastructure owners. This study has also lifted the impact of short duration stoppages, thus highlighting the total influence in terms of reduced life length, quality and productivity. This approach can be used by plant engineers, asset managers and infrastructure owners to assess the performance of maintenance process.

Originality/value

This paper presents an approach for identifying MPIs relevant to the plant status and facilitating measuring maintenance performance at corporate level in a structured way.

Keywords

Citation

Parida, A. (2007), "Study and analysis of maintenance performance indicators (MPIs) for LKAB: A case study", Journal of Quality in Maintenance Engineering, Vol. 13 No. 4, pp. 325-337. https://doi.org/10.1108/13552510710829434

Publisher

:

Emerald Group Publishing Limited

Copyright © 2007, Emerald Group Publishing Limited