Management of change order claims in the Egyptian industrial construction sector
Journal of Financial Management of Property and Construction
ISSN: 1366-4387
Article publication date: 1 March 2007
Abstract
The term claim has become of paramount significance in construction projects worldwide. This research is targeted at providing a deeper insight of the status of claims management in general and change order claims in particular with respect to the Egyptian industrial construction sector, as change orders have proven to be the main cause of claims in this sector. A questionnaire focusing on persistent issues noted in construction management literature within the past fifteen years was addressed to a selected sample of Egyptian construction industrial projects. The results furnished by the sampled projects demonstrated clearly that claims management in the Egyptian industrial construction sector has been suffering from a variety of impediments, including lack of proper notification procedures in public contracts and poor documentation management. The results indicated that oral change orders were present in nearly 76% of the sample projects and that half of these oral changes resulted in loss of rights due to improper documentation, which could be attributed to the lack of the contract awareness of the site team and to the “fear of consultant” phenomenon. The main cause of change orders was categorised by approximately 67% of the respondents as the additional scope of work, which was largely attributed to the fast track nature of the industrial sector. The research also identified several factors associated with time and cost increases of the sampled projects, among which were: private ownership and unit rate contracts. Finally, several recommendations for improving claims management are put forward. They included: the formation of a unified form of general contract condition for all the Egyptian industrial sector; the use of information technology systems in lieu of traditional filing procedures and the inclusion of a float‐sharing provision in contracts.
Keywords
Citation
Hassanein, A.A.G. and El Nemr, W. (2007), "Management of change order claims in the Egyptian industrial construction sector", Journal of Financial Management of Property and Construction, Vol. 12 No. 1, pp. 45-60. https://doi.org/10.1108/13664380780001093
Publisher
:Emerald Group Publishing Limited
Copyright © 2007, Emerald Group Publishing Limited