To read this content please select one of the options below:

The way towards cooperative project delivery

Ailke Heidemann (Institute for Technology and Management in Construction (TMB), Karlsruhe Institute for Technology (KIT), Karlsruhe, Germany)
Fritz Gehbauer (Institute for Technology and Management in Construction (TMB), Karlsruhe Institute for Technology (KIT), Karlsruhe, Germany)

Journal of Financial Management of Property and Construction

ISSN: 1366-4387

Article publication date: 19 April 2011

1584

Abstract

Purpose

Lean construction enhances cooperative project delivery with a focus on customer needs and the optimization of the project as a whole rather than pieces during the design phase, as well as, during construction. The purpose of this paper is to show that by using the lean approach, project results will be positively influenced by a cooperative project delivery, in the areas of cost, time and quality. Also, the full application of the lean cooperative model is limited by strict design‐bid‐build tender regulations required for public clients.

Design/methodology/approach

The existing lean project delivery system in the USA and the corresponding contract – the integrated form of agreement – and, the Australian alliance agreements have been analysed. The main focus of the analysis has been to identify the fundamental characteristics and factors of success concerning a cooperative project delivery. As a result, a lean system which includes the key parts for cooperative project delivery from the client's perspective will be presented in this paper. It identifies which procurement rules are impediments to early cooperation and – hence – would have to be modified. The reasons for those modifications are given on the basis of the case studies.

Findings

It was difficult to compare the results of different projects and to allocate the influence of different tools to the outcomes in terms of cost, time and quality.

Originality/value

A matrix has been developed that measures qualitative results and correlates it to the use of the tools and is presented in the paper.

Keywords

Citation

Heidemann, A. and Gehbauer, F. (2011), "The way towards cooperative project delivery", Journal of Financial Management of Property and Construction, Vol. 16 No. 1, pp. 19-30. https://doi.org/10.1108/13664381111116052

Publisher

:

Emerald Group Publishing Limited

Copyright © 2011, Emerald Group Publishing Limited

Related articles