Research on the Throughput Impact of the Strategic Stabilizing Capacity Constraint Resources by Prolonging Planning Period

Horng‐Huei Wu (Department of Industrial Engineering and System Management Chung‐Hua University No. 707, Sec. 2, WuFu Rd., Hsin‐Chu, Taiwan 300, R.O.C)
Ching‐Piao Chen (Department of Industrial Engineering and Management Ta‐Hwa Institute of Technology, 1 Ta‐Hwa Road, Chung‐Lin Hsin‐Chu, Taiwan, ROC)
Chih‐Hung Tsai (Department of Information Management Yuan‐Pei University, No. 306, Yuan‐pei Street, Hsin‐Chu, Taiwan)
Kuo‐Wei Huang (Department of Industrial Engineering and System Management Chung‐Hua University No. 707, Sec. 2, WuFu Rd., Hsin‐Chu, Taiwan 300, R.O.C)

Asian Journal on Quality

ISSN: 1598-2688

Article publication date: 21 August 2009

274

Abstract

The issue of capacity constraint resources (CCR) or bottlenecks wandering in product mix decision by applying Theory of Constraints (TOC) management philosophy has been mentioned and demonstrated in several papers. In this study, the effect for prolonging the planning period (PPP) so as to stabilize the CCR is investigated. The results show that the effect for PPP alternative will be positive or negative which is depending on the environment condition. However, a majority cases which have positive effect for PPP alternative can be recognized prior knowing the marketing demand, which is significant in the real application.

Keywords

Citation

Wu, H., Chen, C., Tsai, C. and Huang, K. (2009), "Research on the Throughput Impact of the Strategic Stabilizing Capacity Constraint Resources by Prolonging Planning Period", Asian Journal on Quality, Vol. 10 No. 2, pp. 29-42. https://doi.org/10.1108/15982680980001443

Publisher

:

Emerald Group Publishing Limited

Copyright © 2009, Emerald Group Publishing Limited

Related articles