To read this content please select one of the options below:

Development and validation of a framework for preventing and mitigating construction delay using 4D BIM platform in Bangladeshi construction sector

Mohammad Nafe Assafi (Department of Civil and Environmental Engineering, Mississippi State University, Mississippi, MS, USA)
Md. Mehrab Hossain (Department of Building Engineering and Construction Management, Khulna University of Engineering and Technology, Khulna, Bangladesh)
Nicholas Chileshe (UniSA STEM, Sustainable Infrastructure and Resource Management (SIRM), University of South Australia, Adelaide, Australia and Faculty of Engineering and the Built Environment, University of Johannesburg, Johannesburg, South Africa)
Shuvo Dip Datta (Department of Building Engineering and Construction Management, Khulna University of Engineering and Technology, Khulna, Bangladesh)

Construction Innovation

ISSN: 1471-4175

Article publication date: 23 August 2022

Issue publication date: 27 November 2023

577

Abstract

Purpose

As a developing nation, Bangladesh still has scarce technological applications in the construction sector, which results in construction delays. This paper aims to propose a framework that will diminish manual labor, reduce human error and apply four-dimensional (4D) building information modeling (BIM)-based solutions to mitigate and prevent construction project delays.

Design/methodology/approach

First, a systematic literature review was conducted on analyzing the construction delay scenario in the context of Bangladesh and other countries. Next, a 4D BIM-based framework was developed using Autodesk Navisworks Manage. Finally, it was used to run on-site simulations on an ongoing construction project which faced delays because of design errors and inefficient planning.

Findings

Affirmative results were found from applying these methods through real-time project simulation. The current status of the project and the status after using BIM technology were compared. It was observed that during both the preconstruction and execution phases, the application of 4D BIM could reduce the delay posed by design error and inefficient planning.

Practical implications

The project manager and the design engineers can use these frameworks to review their projects. For the design engineers, the preconstruction phase portion of the framework will help identify the probable errors in the design. For the project managers, keeping track of time using the execution phase portion of the framework will be resourceful.

Originality/value

To the best of the authors’ knowledge, this study is the first to assess the significant delay factors endemic in Bangladesh and develop a BIM-based technological solution. This study is solely dedicated to reforming the construction techniques in Bangladesh through the application of 4D BIM technology.

Keywords

Acknowledgements

The authors of this study are grateful to the Department of Building Engineering and Construction Management, Khulna University of Engineering and Technology, for providing a small stipend for this study. The authors would also like to express their gratitude to the people affiliated with the data collection and completion of this study.

Citation

Nafe Assafi, M., Hossain, M.M., Chileshe, N. and Datta, S.D. (2023), "Development and validation of a framework for preventing and mitigating construction delay using 4D BIM platform in Bangladeshi construction sector", Construction Innovation, Vol. 23 No. 5, pp. 1255-1278. https://doi.org/10.1108/CI-08-2021-0160

Publisher

:

Emerald Publishing Limited

Copyright © 2020, Emerald Publishing Limited

Related articles