Differential relationships in the BIM implementation process in a developing country: the role of essential BIM implementation strategies

Oluseye Olugboyega (Department of Building, Obafemi Awolowo University, Ile-Ife, Nigeria)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 24 March 2023

475

Abstract

Purpose

Some BIM implementation strategies are critical, while others are insignificant and ineffective in terms of lowering BIM adoption obstacles and promoting widespread acceptance of BIM in projects. The BIM literature has not provided evidence to support this claim or identify the fundamental BIM implementation strategies. This study filled this gap by identifying and investigating the effect of fundamental BIM implementation methodologies on the occurrence of proportional impacts between stages.

Design/methodology/approach

The findings indicate a positive and crucial relationship between the stages of the BIM implementation strategies and the reduction of barriers (r = 1.79, z = 2.15), preliminary and sustained BIM adoption barriers (r = 1.53, z = 60.83), BIM adoption on projects and BIM-enabled integration and collaboration (r = 0.7, z = 2.74). This validates the model's hypotheses and demonstrates that the fundamental BIM implementation strategies will accelerate the reduction of BIM adoption hurdles. The impact, however, will be the same for both sustained and preliminary barriers. This implies that lowering the obstacles alone will not secure BIM adoption.

Findings

The validation of the model's hypotheses demonstrated that the fundamental BIM implementation strategies will accelerate the reduction of BIM adoption hurdles. The impact, however, will be the same for both sustained and preliminary barriers. This implies that lowering BIM adoption obstacles alone will not secure BIM adoption. This study proposes that BIM deployment tactics be carefully chosen in order to remove preliminary impediments, reduce barriers and energise BIM acceptance.

Research limitations/implications

In line with the findings of this study, BIM adoption must be consistent and long-term before the benefits in project execution become evident and substantiated. The BIM abilities of project participants, the feasibility of BIM conventions and the proficiency of BIM supervisors may all play a role in this.

Practical implications

This research implies a few approaches and tactics for implementing BIM in an efficient and beneficial manner. The study's findings imply that BIM deployment tactics should be carefully chosen in order to remove preliminary impediments, reduce barriers and energise BIM acceptance. It also explains how to structure BIM implementation strategies in developing countries. Another significant practical implication is the model's conclusion on the benefits of BIM adoption.

Originality/value

This study emphasises the significance of understanding the interrelatedness between the stages of the BIM implementation process in order to promote unavoidable and high-quality BIM adoption, as well as identifying the essential strategies that will guide policymakers and industry players in improving and pursuing successful BIM implementation. This study adds to BIM implementation theories by providing new information on the models, stages and interconnections of the BIM implementation process. However, the study could not identify the factors that impede BIM adoption despite the reduction in barriers and use of fundamental BIM implementation strategies.

Keywords

Citation

Olugboyega, O. (2023), "Differential relationships in the BIM implementation process in a developing country: the role of essential BIM implementation strategies", Engineering, Construction and Architectural Management, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/ECAM-10-2022-0999

Publisher

:

Emerald Publishing Limited

Copyright © 2023, Emerald Publishing Limited

Related articles