A contingency approach for time-cost trade-off in construction projects based on machine learning techniques

Peipei Wang (School of Civil and Ocean Engineering, Jiangsu Ocean University, Lianyungang, China)
Kun Wang (Department of Engineering Management, School of Engineering, The University of Manchester, Manchester, UK)
Yunhan Huang (School of Civil and Ocean Engineering, Jiangsu Ocean University, Lianyungang, China)
Peter Fenn (Department of Engineering Management, School of Engineering, The University of Manchester, Manchester, UK)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 29 May 2023

256

Abstract

Purpose

Time-cost trade-off is normal conduct in construction projects when projects are expectedly late for delivery. Existing research on time-cost trade-off strategic management mostly focused on the technical calculation towards the optimal combination of activities to be accelerated, while the managerial aspects are mostly neglected. This paper aims to understand the managerial efforts necessary to prepare construction projects ready for an upcoming trade-off implementation.

Design/methodology/approach

A preliminary list of critical factors was first identified from the literature and verified by a Delphi survey. Quantitative data was then collected by a questionnaire survey to first shortlist the preliminary factors and quantify the predictive model with different machine learning algorithms, i.e. k-nearest neighbours (kNN), radial basis function (RBF), multiplayer perceptron (MLP), multinomial logistic regression (MLR), naïve Bayes classifier (NBC) and Bayesian belief networks (BBNs).

Findings

The model's independent variable importance ranking revealed that the top challenges faced were the realism of contractual obligation, contractor planning and control and client management and monitoring. Among the tested machine learning algorithms, multilayer perceptron was demonstrated to be the most suitable in this case. This model accuracy reached 96.5% with the training dataset and 95.6% with an independent test dataset and could be used as the contingency approach for time-cost trade-offs.

Originality/value

The identified factor list contributed to the theoretical explanation of the failed implementation in general and practical managerial improvement to better avoid such failure. In addition, the established predictive model provided an ad-hoc early warning and diagnostic tool to better ensure time-cost implementation success.

Keywords

Acknowledgements

This project receives financial support from Lianyungang Haiyan Project (No. 2021-QD-014).

Citation

Wang, P., Wang, K., Huang, Y. and Fenn, P. (2023), "A contingency approach for time-cost trade-off in construction projects based on machine learning techniques", Engineering, Construction and Architectural Management, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/ECAM-11-2022-1104

Publisher

:

Emerald Publishing Limited

Copyright © 2023, Emerald Publishing Limited

Related articles