To read this content please select one of the options below:

Change order effects on labor productivity and mitigation the effects by developing policies using system dynamic modeling: a case study in a construction project

Nadira Islam Nila (Department of Building Engineering and Construction Management, Khulna University of Engineering and Technology, Khulna, Bangladesh)
Jhumana Akter (Department of Building Engineering and Construction Management, Khulna University of Engineering and Technology, Khulna, Bangladesh)
Md. Mehrab Hossain (Department of Building Engineering and Construction Management, Khulna University of Engineering and Technology, Khulna, Bangladesh)

International Journal of Building Pathology and Adaptation

ISSN: 2398-4708

Article publication date: 17 July 2023

82

Abstract

Purpose

Change orders are a typical occurrence in building projects. Change orders indirectly affect labor productivity, resulting in a significant delay in the completion of a building project. Change orders cause labor productivity losses that are difficult to describe, establish and account for contractors and subcontractors. This study aimed to look at the influence of change orders on labor productivity and develop methods to mitigate their adverse effects.

Design/methodology/approach

To assess the change orders' impact on productivity levels a system dynamic model was developed and devise ways were developed to counteract these negative impacts in this research. The impact of change orders on labor productivity and project time was then controlled using techniques established. Finally, a case study of KUET's hall extension was chosen, and the model and principles developed were implemented.

Findings

This study established that if the project delivery date is set and change orders are occurring often, labor productivity will be impacted. With adequate monitoring and supplemental management techniques, it can be reduced by prolonging the project.

Originality/value

The developed policies aid to mitigate the effect of change orders on labor productivity.

Keywords

Citation

Nila, N.I., Akter, J. and Hossain, M.M. (2023), "Change order effects on labor productivity and mitigation the effects by developing policies using system dynamic modeling: a case study in a construction project", International Journal of Building Pathology and Adaptation, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/IJBPA-11-2022-0184

Publisher

:

Emerald Publishing Limited

Copyright © 2023, Emerald Publishing Limited

Related articles