City gas distribution projects delay in India: a critical assessment of risks

Atul Rawat (Department of Energy Management in School of Business, University of Petroleum and Energy Studies, Dehradun, India)
Sumeet Gupta (University of Petroleum and Energy Studies, Dehradun, India)
T. Joji Rao (University of Petroleum and Energy Studies, Dehradun, India)

International Journal of Energy Sector Management

ISSN: 1750-6220

Article publication date: 9 June 2021

Issue publication date: 2 November 2021

227

Abstract

Purpose

This study aims to identify and rank the operational and financial risks causing a delay in the commencement of the city gas distribution project in India.

Design/methodology/approach

This study reviews the literature to identify operational and financial risks variables associated with infrastructure projects. Followed by a survey to isolate and assess the critical risk factors for city gas distribution network project in India. The survey data is evaluated using factor analysis to understand the latent structure of the critical risk factors. Second, the author ranks the identified variables as per significance by using the mean score method.

Findings

Five critical risk factors with 20 variables were extracted and assessed to build more understanding of their significance and impact on city gas distribution network project.

Originality/value

This study is the first attempt to follow the management approach to identify and rank operational and financial risks impacting city gas distribution project.

Keywords

Citation

Rawat, A., Gupta, S. and Rao, T.J. (2021), "City gas distribution projects delay in India: a critical assessment of risks", International Journal of Energy Sector Management, Vol. 15 No. 6, pp. 1163-1180. https://doi.org/10.1108/IJESM-09-2020-0005