To read this content please select one of the options below:

The use of performance-based contracting in managing the outsourcing of a reliability-centered maintenance program: A case study

Mirghani N. Ahmed (Department of Accounting and Finance, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia)

Journal of Quality in Maintenance Engineering

ISSN: 1355-2511

Article publication date: 10 December 2019

Issue publication date: 2 September 2020

1167

Abstract

Purpose

The purpose of this paper is to present a case study on the use of performance-based contracting in the outsourcing of a reliability-centered maintenance program of a Gulf oil refinery.

Design/methodology/approach

A case study method is used whereby data are collected through semi-structured interviews, informal discussions with executives from the participant companies, in addition to official documents and secondary materials.

Findings

The case analysis reveals the use of a risk–reward payment scheme and key performance indicators (KPIs) deployed to support the management of the outsourced maintenance function. The financial incentive scheme was clearly designed to motivate the outsourcing contractor to achieve more financial benefits when meeting a defined set of KPIs while also delivering operating cost savings and other qualitative benefits to the outsourcing company. Managing the outsourced function also involved the use of routine budgetary control systems, in addition to other informal control mechanisms such as trust, knowledge sharing, mutual understanding and co-operation between the two collaborative partners.

Practical implications

The evidence presented in the case description and analysis may assist in increasing the understanding of how outsourcing relationships in maintenance business are managed and evaluated. The case findings may also provide the opportunity for further research investigating the use of performance measurement systems and incentive-based schemes in a variety of maintenance contracts.

Originality/value

The case study presents new empirical evidence on the use of performance risk–reward payment schemes in the management of an outsourcing relationship. Findings reported in the study will add to the existing literature on maintenance performance measurement and management practices in outsourcing relationships.

Keywords

Citation

Ahmed, M.N. (2020), "The use of performance-based contracting in managing the outsourcing of a reliability-centered maintenance program: A case study", Journal of Quality in Maintenance Engineering, Vol. 26 No. 4, pp. 526-554. https://doi.org/10.1108/JQME-02-2018-0007

Publisher

:

Emerald Publishing Limited

Copyright © 2019, Emerald Publishing Limited

Related articles