Aerospace achievements

Aircraft Engineering and Aerospace Technology

ISSN: 0002-2667

Article publication date: 5 September 2008

115

Citation

(2008), "Aerospace achievements", Aircraft Engineering and Aerospace Technology, Vol. 80 No. 5. https://doi.org/10.1108/aeat.2008.12780eaf.002

Publisher

:

Emerald Group Publishing Limited

Copyright © 2008, Emerald Group Publishing Limited


Aerospace achievements

Article Type: Features From: Aircraft Engineering and Aerospace Technology: An International Journal, Volume 80, Issue 5

Area of improvements - Effective date

  • IT equipment upgrades - May 2006

  • CATIA installation and training - August 2006

  • Dimensional inspection upgrades - August 2006

  • Forge shop furnace upgrades - October 2006

  • New cutting equipment - October 2006

  • ERP system implementation - January 2007

  • AS9100 certification - February 2007

  • New heat treat control system - March 2007

  • New NDT equipment - March 2007

  • New forge shop furnace control system - March 2007

  • NDT certification: EN4179 and NAS 410 - June 2007

  • Die department equipment upgrades - October 2007

  • Metallurgical Lab equipment upgrades - December 2007

  • Nadcap certification: NDT - January 2008

  • New heat-treat line - May 2008

  • Nadcap Certification: heat treating - Pending

  • Nadcap certification: Met lab - Pending

  • Forging process modeling - Pending.

Related articles