A Practical Approach to the Apparel Production‐planning and Scheduling Problem
International Journal of Clothing Science and Technology
ISSN: 0955-6222
Article publication date: 1 February 1992
Abstract
Considers the daily production‐scheduling problem in the “make‐to‐order” apparel‐manufacturing industry and presents a solution procedure for the problem based on the simulated annealing technique. The development is aimed at the quick generation of a feasible solution and the improvement on the solution.
Keywords
Citation
Chen, C., Racine, R. and Swift, F. (1992), "A Practical Approach to the Apparel Production‐planning and Scheduling Problem", International Journal of Clothing Science and Technology, Vol. 4 No. 2/3, pp. 9-17. https://doi.org/10.1108/eb002988
Publisher
:MCB UP Ltd
Copyright © 1992, MCB UP Limited