To read this content please select one of the options below:

Productivity bones

Facilities

ISSN: 0263-2772

Article publication date: 1 July 1985

62

Abstract

Some controversy has been stirred up by the conclusion, reached in the BOSTI report on office design and productivity, that design has a calculable dollar premium. In response to Peter Ellis's detailed, point by point analysis of the report (Vol 3/No 1/January) the joint authors have made an equally detailed rebuttal.

Citation

(1985), "Productivity bones", Facilities, Vol. 3 No. 7, pp. 14-14. https://doi.org/10.1108/eb006339

Publisher

:

MCB UP Ltd

Copyright © 1985, MCB UP Limited

Related articles