To read this content please select one of the options below:

Integrated Logistics Systems with Distribution Resources Planning

Logistics Information Management

ISSN: 0957-6053

Article publication date: 1 April 1990

1611

Abstract

Planning systems are only as good as their interface with the distribution function. If distribution is having an adverse effect on the overall logistics system, then we have a “systems gap”. What is then needed is the use of distribution requirements planning (DRP), a powerful method with which to integrate the logistics systems of organisations.

Keywords

Citation

Edwards, L. and Lucas, R. (1990), "Integrated Logistics Systems with Distribution Resources Planning", Logistics Information Management, Vol. 3 No. 4, pp. 26-34. https://doi.org/10.1108/eb007519

Publisher

:

MCB UP Ltd

Copyright © 1990, MCB UP Limited

Related articles