To read this content please select one of the options below:

Special helically wound pipes for Cairo wastewater scheme

Anti-Corrosion Methods and Materials

ISSN: 0003-5599

Article publication date: 1 April 1988

15

Abstract

The £1,000 million Phase 1 of the Greater Cairo Wastewater Scheme has been instrumental in bringing forward many innovative ideas. Among them has been the use of the Helix process for the production of special pipe sections of up to six feet diameter for the discharge openings into the main sewer.

Citation

(1988), "Special helically wound pipes for Cairo wastewater scheme", Anti-Corrosion Methods and Materials, Vol. 35 No. 4, pp. 8-8. https://doi.org/10.1108/eb020647

Publisher

:

MCB UP Ltd

Copyright © 1988, MCB UP Limited

Related articles