Special helically wound pipes for Cairo wastewater scheme
15
Abstract
The £1,000 million Phase 1 of the Greater Cairo Wastewater Scheme has been instrumental in bringing forward many innovative ideas. Among them has been the use of the Helix process for the production of special pipe sections of up to six feet diameter for the discharge openings into the main sewer.
Citation
(1988), "Special helically wound pipes for Cairo wastewater scheme", Anti-Corrosion Methods and Materials, Vol. 35 No. 4, pp. 8-8. https://doi.org/10.1108/eb020647
Publisher
:MCB UP Ltd
Copyright © 1988, MCB UP Limited