To read this content please select one of the options below:

A Light Aeroplane in Production: Some Details of the North American Navion Manufacturing and Tooling Processes Applied as the Outcome of Wartime Experience

Aircraft Engineering and Aerospace Technology

ISSN: 0002-2667

Article publication date: 1 January 1947

48

Abstract

ON a system of mechanized conveyors very similar to its wartime P‐51 Mustang line, North American Aviation, Inc. on the Los Angeles Municipal Airport is turning out Navions at the rate of six per day. Scheduled production called for ten per day before the end of 1946.

Citation

(1947), "A Light Aeroplane in Production: Some Details of the North American Navion Manufacturing and Tooling Processes Applied as the Outcome of Wartime Experience", Aircraft Engineering and Aerospace Technology, Vol. 19 No. 1, pp. 29-31. https://doi.org/10.1108/eb031462

Publisher

:

MCB UP Ltd

Copyright © 1947, MCB UP Limited

Related articles