Preparation of an Overhaul Schedule for Use After a Heavy Landing: A Work Schedule Based on a Study of Action to be taken Following Landing Incidents with the Sud‐Aviation Caravelle

Decomps (Methods Representatives at the Sud‐Aviation Works at Toulouse.)
De Caumont (Methods Representatives at the Sud‐Aviation Works at Toulouse.)

Aircraft Engineering and Aerospace Technology

ISSN: 0002-2667

Article publication date: 1 May 1964

44

Abstract

THERE seems to be little point in describing the ’product' which is the subject of this thesis since the Sud‐Aviation S.E.210 Caravelle twin‐jet, medium‐range aircraft is known the world over.

Citation

Decomps and Caumont, D. (1964), "Preparation of an Overhaul Schedule for Use After a Heavy Landing: A Work Schedule Based on a Study of Action to be taken Following Landing Incidents with the Sud‐Aviation Caravelle", Aircraft Engineering and Aerospace Technology, Vol. 36 No. 5, pp. 132-136. https://doi.org/10.1108/eb033869

Publisher

:

MCB UP Ltd

Copyright © 1964, MCB UP Limited