Ear‐to‐ground
Aircraft Engineering and Aerospace Technology
ISSN: 0002-2667
Article publication date: 1 September 1965
Abstract
British European Airways have now signed a contract worth £30 million for fifteen Hawker Siddeley Trident 2E airliners and spares for delivery in time for B.E.A.'s summer services in 1968. An option has also been taken on a further ten Trident 2Es.
Citation
(1965), "Ear‐to‐ground", Aircraft Engineering and Aerospace Technology, Vol. 37 No. 9, pp. 286-286. https://doi.org/10.1108/eb034072
Publisher
:MCB UP Ltd
Copyright © 1965, MCB UP Limited