Ear‐to‐ground
Aircraft Engineering and Aerospace Technology
ISSN: 0002-2667
Article publication date: 1 April 1972
Abstract
In the two years since the last show, the organisers have put in hand considerable improvements in the Torino Caselle airport to improve facilities that should become apparent at the Turin Air Show on 1st to 11th June. These include improvements in the food and restaurant section and the construction of a new power station to deliver 1,000KwLh to improve the illumination.
Citation
(1972), "Ear‐to‐ground", Aircraft Engineering and Aerospace Technology, Vol. 44 No. 4, pp. 47-47. https://doi.org/10.1108/eb034899
Publisher
:MCB UP Ltd
Copyright © 1972, MCB UP Limited