European Transonic Windtunnel Project
Aircraft Engineering and Aerospace Technology
ISSN: 0002-2667
Article publication date: 1 December 1990
Abstract
FOSTER Wheeler Energy and Air Products, in a joint venture, have been awarded a contract for the Nitrogen and Dry Air systems for the European Transonic Windtunnel (ETW), now under construction in Cologne. The total cost of the Nitrogen and Dry Air systems is anticipated to be around DM.55 million (£18.9m.).
Citation
(1990), "European Transonic Windtunnel Project", Aircraft Engineering and Aerospace Technology, Vol. 62 No. 12, pp. 18-19. https://doi.org/10.1108/eb037033
Publisher
:MCB UP Ltd
Copyright © 1990, MCB UP Limited