To read this content please select one of the options below:

Work Study Volume 23 Issue 1

Work Study

ISSN: 0043-8022

Article publication date: 1 January 1974

99

Abstract

The Stevenage distribution centre of British Insulated Callender Cables found its internal telephone system not only slow and inconvenient in use but, worst of all, unreliable. In choosing a new communication system reliability was the important fact, for a large distribution centre can only run smoothly if there is efficient internal transfer of information.

Citation

(1974), "Work Study Volume 23 Issue 1", Work Study, Vol. 23 No. 1, pp. 3-36. https://doi.org/10.1108/eb048299

Publisher

:

MCB UP Ltd

Copyright © 1974, MCB UP Limited

Related articles