To read this content please select one of the options below:

Lubrication of Generators at the Aswan Dam

Industrial Lubrication and Tribology

ISSN: 0036-8792

Article publication date: 1 April 1960

32

Abstract

ON January 10th last, President Nasser switched on the first of seven main and two auxiliary turbines of the hydro‐electric installation on the existing Aswan Dam on the River Nile, which, altogether, will provide 1,860 kWh of electricity.

Citation

(1960), "Lubrication of Generators at the Aswan Dam", Industrial Lubrication and Tribology, Vol. 12 No. 4, pp. 31-32. https://doi.org/10.1108/eb052621

Publisher

:

MCB UP Ltd

Copyright © 1960, MCB UP Limited

Related articles