Lubrication of Generators at the Aswan Dam
32
Abstract
ON January 10th last, President Nasser switched on the first of seven main and two auxiliary turbines of the hydro‐electric installation on the existing Aswan Dam on the River Nile, which, altogether, will provide 1,860 kWh of electricity.
Citation
(1960), "Lubrication of Generators at the Aswan Dam", Industrial Lubrication and Tribology, Vol. 12 No. 4, pp. 31-32. https://doi.org/10.1108/eb052621
Publisher
:MCB UP Ltd
Copyright © 1960, MCB UP Limited