To read this content please select one of the options below:

ANOTHER TRIP DOWN DUMBLEDERRY LANE

Industrial Lubrication and Tribology

ISSN: 0036-8792

Article publication date: 1 February 1985

14

Abstract

BP Oil open Phase 1 of a £5.75 extension at the Aldridge, W. Midlands, lubricant blending and packaging plant designed to supply the entire BP‐Duckams network.

Citation

(1985), "ANOTHER TRIP DOWN DUMBLEDERRY LANE", Industrial Lubrication and Tribology, Vol. 37 No. 2, pp. 68-68. https://doi.org/10.1108/eb053298

Publisher

:

MCB UP Ltd

Copyright © 1985, MCB UP Limited

Related articles