To read this content please select one of the options below:

The Determination of In‐Process Inventory and Manufacturing Lead Time in Multi‐Stage Production Systems

M.A. Ornek (Industrial Engineering DYO and Sadolin Paint and Varnish, Izmir, Turkey, and University of Wales Institute of Science and Technology, UK)
P.I. Collier (Industrial Engineering DYO and Sadolin Paint and Varnish, Izmir, Turkey, and University of Wales Institute of Science and Technology, UK)

International Journal of Operations & Production Management

ISSN: 0144-3577

Article publication date: 1 January 1988

181

Abstract

In most manufacturing systems, a number of production stages are involved between which some in‐process inventory usually occurs. This inventory imposes a further cost on the overall system, not only in terms of investment charges but also shop floor congestion, additional material handling charges and loss of floor space. In attempting to optimise this in‐process inventory a necessary balance must be obtained with the associated manufacturing lead time. A mathematical model is devised to achieve the above in a multi‐stage production system and this is demonstrated by application to a set of actual industrial data.

Keywords

Citation

Ornek, M.A. and Collier, P.I. (1988), "The Determination of In‐Process Inventory and Manufacturing Lead Time in Multi‐Stage Production Systems", International Journal of Operations & Production Management, Vol. 8 No. 1, pp. 74-80. https://doi.org/10.1108/eb054815

Publisher

:

MCB UP Ltd

Copyright © 1988, MCB UP Limited

Related articles