Engineering, Construction and Architectural Management: Volume 2 Issue 3

Subject:

Table of contents

Improved business results through benchmarking

EDWARD W. MERROW, WILLIAM H. CROKER

Chevron has successfully used benchmarking to improve the performance of our project management system.

The organization of construction research in British universities

PETER R. LANSLEY, RACHAEL LUCK, SARAH LUPTON

The paper provides details of the size and scope of construction research carried out in a number of architecture, civil engineering and building related departments in British…

The New Engineering Contract: principles of design and risk allocation

JOHN G. PERRY

The paper begins with a brief history of the New Engineering Contract (NEC) and outlines the response by the NEC Panel to the proposals made in the Latham Report. The main…

1715

Environments of construction

YNGVE HAMMARLUND

Development of strategies and long‐term decision making play important roles in construction due to the considerable service length of its products. In construction firms…

A GIS‐based pipeline planning system

SAEED M. FENIS, JAMES E. DIEKMANN, PEI‐YU HUANG

This paper describes a research and development effort on a GIS‐based pipeline planning system (GIS‐based PPS). Research was first conducted to identify the aspects of pipeline…

Cover of Engineering, Construction and Architectural Management

ISSN:

0969-9988

Online date, start – end:

1994

Copyright Holder:

Emerald Publishing Limited

Open Access:

hybrid

Editor:

  • Professor Chimay Anumba