Engineering, Construction and Architectural Management: Volume 27 Issue 2

Subject:

Table of contents

Challenges of attracting construction workers to skill development and training programmes

Sparsh Johari, Kumar Neeraj Jha

The purpose of this paper is to investigate the factors that discourage construction workers from undergoing skill development training, and to suggest steps for making the…

1646

A domain-specific measure of centrality for water distribution networks

Seyed Ashkan Zarghami, Indra Gunawan

In recent years, centrality measures have been extensively used to analyze real-world complex networks. Water distribution networks (WDNs), as a good example of complex networks…

The application of an ANP-Fuzzy comprehensive evaluation model to assess lean construction management performance

X.K. Li, X.M. Wang, L. Lei

The purpose of this paper is to propose a method for assessing the lean construction management performance (LCMP) of engineering projects using the analytic network process-fuzzy…

1353

Review of global mental health research in the construction industry: A science mapping approach

Janet M. Nwaogu, Albert P.C. Chan, Carol K.H. Hon, Amos Darko

The demanding nature of the construction industry poses strain that affects the health of construction personnel. Research shows that mental ill health in this industry is…

3113

The ecosystem of drivers for electronic procurement adoption for construction project procurement: A systematic review and future research directions

Sitsofe Kwame Yevu, Ann Tit Wan Yu

The purpose of this paper is to present a review of research developments on the ecosystem of driving forces for electronic procurement (e-procurement) on project procurement and…

1497

Aligning financial and functional equivalent depreciations rates of building assets

Filipa Salvado, Nuno Almeida, Alvaro Vale e Azevedo

Both financial and non-financial functions are imbedded in the life-cycle management activities of building assets. These functions provide relevant information for the…

A domain knowledge incorporated text mining approach for capturing user needs on BIM applications

Shenghua Zhou, S. Thomas Ng, Sang Hoon Lee, Frank J. Xu, Yifan Yang

In the architecture, engineering and construction (AEC) industry, technology developers have difficulties in fully understanding user needs due to the high domain knowledge…

A method to evaluate credit risk for banks under PPP project finance

Xiuqin Wang, Lanmin Shi, Bing Wang, Mengying Kan

The purpose of this paper is to provide a method that can better evaluate the credit risk (CR) under PPP project finance.

A reconfigurable model for implementation in the closing phase of a wind turbines project construction

Shakib Zohrehvandi, Mario Vanhoucke, Roya Soltani, Mehrdad Javadi

The purpose of this paper is to introduce a reconfigurable model that is a combination of a schedule model and a queuing system M/M/m/K to reduce the duration of the wind turbine…

Site planning and design of green residential building projects: case studies in China

Xiaosen Huo, Ann Tit Wan Yu, Wu Zezhou, Wadu Mesthrige Jayantha

The purpose of this paper is to present site planning and design (SPD) relevant variables and items in practice for practitioners to better understand and implement SPD in green…

PPP projects: improvements in stakeholder management

Chika Amadi, Pat Carrillo, Martin Tuuli

The implementation of public–private partnerships (PPPs), particularly in low- and middle-income countries, has been hampered by external stakeholders’ opposition leading to the…

1569

Improved similarity measure in case-based reasoning: a case study of construction cost estimation

Won-Gil Hyung, Sangyong Kim, Jung-Kyu Jo

Applied a hybrid approach using genetic algorithms (GAs) for a case-based retrieval process in order to increase the overall improved cost accuracy for a case-based library. The…

Synthesising performance in the construction industry: An analysis of performance indicators to promote project improvement

Felipe Mellado, Eric C.W. Lou, Christian L. Correa Becerra

There is a long-standing interest in performance improvement within the construction industry. Approaches based upon cost, time and quality (often called the Iron Triangle), have…

1232
Cover of Engineering, Construction and Architectural Management

ISSN:

0969-9988

Online date, start – end:

1994

Copyright Holder:

Emerald Publishing Limited

Open Access:

hybrid

Editor:

  • Professor Chimay Anumba