Search
  Advanced Search
 
Journal search
Journal cover: Engineering, Construction and Architectural Management

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Online from: 1994

Subject Area: Built Environment

Content: Latest Issue | icon: RSS Latest Issue RSS | Previous Issues

Options: To add Favourites and Table of Contents Alerts please take a Emerald profile

Previous article.Icon: Print.Table of Contents.Next article.Icon: .

Minimizing waste on construction project sites


Document Information:
Title:Minimizing waste on construction project sites
Author(s):O.O. FANIRAN, (Correspondence: Dr O.O. Faniran, 1/5–7 Riverview Street, West Ryde, NSW 2114, Australia), G. CABAN, (Faculty of Design, Architecture and Building, University of Technology, Sydney, PO Box 123, Broadway, NSW 2007, Australia)
Citation:O.O. FANIRAN, G. CABAN, (1998) "Minimizing waste on construction project sites", Engineering, Construction and Architectural Management, Vol. 5 Iss: 2, pp.182 - 188
Keywords:Australia, Construction waste, Environmental impact assessment, Project management, Sustainable development, Waste minimization
Article type:General review
DOI:10.1108/eb021073 (Permanent URL)
Publisher:MCB UP Ltd
Abstract:Waste minimization strategies and the relative significance of construction waste sources were examined using a survey of 24 construction firms operating in Australia. The results indicated that a sizeable proportion of respondent firms did not have specific policies for minimizing waste. Furthermore, while a majority of firms with specific waste minimization policies made efforts to minimize waste at source, i.e. to avoid generating waste in the first place, this minimization was limited to waste generated by site offices and amenities. Potential scope exists for improving the effectiveness of waste minimization at source by addressing the sources of all waste generated during the construction phase. The survey results indicated that the five most significant sources of construction waste were design changes, leftover material scraps, wastes from packaging and non-reclaimable consumables, design/detailing errors, and poor weather. Potential opportunities for minimizing the amount of waste generated on construction project sites are identified.


Backfiles Disclaimer

Articles that form part of the Emerald Backfiles have been created through digital scanning. Whilst all efforts have been made to ensure accuracy, Emerald will not be held responsible for any inaccuracies. If you require further clarification please contact backfiles@emeraldinsight.com.


Fulltext Options:

Login

Login

Existing customers: login
to access this document

Login


- Forgot password?
- Athens/Institutional login

Purchase

Purchase

Downloadable; Printable; Owned
HTML, PDF (606kb)Purchase

To purchase this item please login or register.

Login


- Forgot password?

Recommend to your librarian

Complete and print this form to request this document from your librarian


Marked list


Bookmark & share

Reprints & permissions