ISSN: 1366-4387
Online from: 2005
Subject Area: Built Environment
Content: Latest Issue |
Latest Issue RSS | Previous Issues
Options: To add Favourites and Table of Contents Alerts please take a Emerald profile
| Title: | Regression modelling of risk impacts on construction cost flow forecast |
|---|---|
| Author(s): | Henry Odeyinka, (School of the Built Environment, University of Ulster – Jordanstown, Belfast, UK), John Lowe, (School of Engineering and Built Environment, Glasgow Caledonian University, Glasgow, UK), Ammar Kaka, (Heriot Watt University, Dubai Campus, Dubai Academic City, Dubai, United Arab Emirates) |
| Citation: | Henry Odeyinka, John Lowe, Ammar Kaka, (2012) "Regression modelling of risk impacts on construction cost flow forecast", Journal of Financial Management of Property and Construction, Vol. 17 Iss: 3, pp.203 - 221 |
| Keywords: | Construction industry, Construction projects, Contractors, Cost flow, Costs, Regression modelling, Risk factors, Risk management, United Kingdom |
| Article type: | Research paper |
| DOI: | 10.1108/13664381211274335 (Permanent URL) |
| Publisher: | Emerald Group Publishing Limited |
| Abstract: | Purpose – Significant risk factors inherent in construction cost flow forecast were identified in this study. The aim of this paper is to develop regression models to assess the impacts of the identified risks on the baseline forecast at the in-progress stage of construction. Design/methodology/approach – Two stages were involved in data collection. The first was a structured questionnaire survey administered on 370 UK contractors to identify significant risk factors inherent in cost flow forecast. The second stage was the collection of forecast and actual cost flow data from 55 case study projects. Variations between these pair of data sets were measured at 30 per cent, 50 per cent, 70 per cent and 100 per cent completion periods. Respondents were then requested to score on a Likert type scale, the extent of occurrence of the significant risk factors in the case study projects. This pair of data sets were used in regression modelling. Findings – Significant risk factors were identified from the questionnaire survey analysis as: changes to initial design, variation to works, production target slippage, delay in agreeing variation/dayworks and delay in settling claims among others. Using the identified significant risk factors and the periodic variability measurements, multiple linear regression models were developed. The models were promising in that they helped to establish the fact that the phenomenon under consideration could be modelled. They also provided some insights in explaining the observed variability between the baseline cost flow forecast and actual cost flow based on risk impacts. Research limitations/implications – The developed models showed a promising level of accuracy but also indicated that the phenomenon under consideration is not strictly linear and may need to explore some other form of modelling. Practical implications – The developed models provide invaluable information to the construction contractors regarding the likely impacts of significant risk variables on cost flow baseline forecast at different stages of construction so that a pro active risk response can be put in place. Originality/value – This study makes an original contribution of providing a modelling insight into the phenomenon of how risks inherent in construction could impact the baseline cost flow forecast at different stages of construction. The information is invaluable in making pro active risk response. |
Downloadable; Printable; Owned
HTML, PDF (123kb)
To purchase this item please login or register.
Complete and print this form to request this document from your librarian