Login

Login
Welcome:
Guest
Bannner:Try our mobile site beta
 
Journal search
Journal cover: Journal of Quality in Maintenance Engineering

Journal of Quality in Maintenance Engineering

ISSN: 1355-2511

Online from: 1995

Subject Area: Managing Quality

Content: Latest Issue | icon: RSS Latest Issue RSS | Previous Issues

Options: To add Favourites and Table of Contents Alerts please take a Emerald profile

Previous article.Icon: Print.Table of Contents.Next article.Icon: .

Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system


Document Information:
Title:Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system
Author(s):Anis Chelbi, (Centre de Recherche en Productique (CEREP), Tunis, Tunisia), Nidhal Rezg, (Laboratoire de Génie Industriel et de Production Mécanique (LGIPM), Metz, France), Mehdi Radhoui, (Laboratoire de Génie Industriel et de Production Mécanique (LGIPM), Metz, France)
Citation:Anis Chelbi, Nidhal Rezg, Mehdi Radhoui, (2008) "Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system", Journal of Quality in Maintenance Engineering, Vol. 14 Iss: 2, pp.161 - 176
Keywords:Inventory, Lot size, Preventive maintenance, Quality
Article type:Research paper
DOI:10.1108/13552510810877665 (Permanent URL)
Publisher:Emerald Group Publishing Limited
Abstract:

Purpose – The purpose of this study is to propose and model an integrated production-maintenance strategy for unreliable production systems producing conforming and non-conforming items.

Design/methodology/approach – The proposed integrated policy is defined and modeled mathematically.

Findings – The paper focuses on finding simultaneously the optimal values of the lot size Q and the age T at which preventive maintenance must be performed. These values minimize the total average cost per time unit over an infinite horizon.

Practical implications – The paper attempts to integrate in a single model the three main aspects of any manufacturing system: production, maintenance, and quality. It deals with the lot-sizing problem for a production system which may randomly shift to an out-of-control state and produce non-conforming units. The system is submitted to an age-based preventive maintenance policy. The effect of performing preventive maintenance on quality- and inventory-related costs is shown through a numerical example.

Originality/value – The paper proposes an integrated model that links EMQ, quality and an age-based preventive maintenance policy. It is shown that performing preventive maintenance yields reduction in inventory- and quality-related costs.



Fulltext Options:

Login

Login

Existing customers: login
to access this document

Login


- Forgot password?

- Athens/Institutional login

Purchase

Purchase

Downloadable; Printable; Owned
HTML, PDF (240kb)Purchase

To purchase this item please login or register.

Login


- Forgot password?

Order

Fill in an Order form to request this document from your librarian


Marked list

Bookmark & share

Reprints & permissions

© Emerald Group Publishing Limited  |  Copyright info  |  Site Policies
..