ISSN: 1355-2511
Online from: 1995
Subject Area: Managing Quality
Content: Latest Issue |
Latest Issue RSS | Previous Issues
Options: To add Favourites and Table of Contents Alerts please take a Emerald profile
| Title: | Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system |
|---|---|
| Author(s): | Anis Chelbi, (Centre de Recherche en Productique (CEREP), Tunis, Tunisia), Nidhal Rezg, (Laboratoire de Génie Industriel et de Production Mécanique (LGIPM), Metz, France), Mehdi Radhoui, (Laboratoire de Génie Industriel et de Production Mécanique (LGIPM), Metz, France) |
| Citation: | Anis Chelbi, Nidhal Rezg, Mehdi Radhoui, (2008) "Simultaneous determination of production lot size and preventive maintenance schedule for unreliable production system", Journal of Quality in Maintenance Engineering, Vol. 14 Iss: 2, pp.161 - 176 |
| Keywords: | Inventory, Lot size, Preventive maintenance, Quality |
| Article type: | Research paper |
| DOI: | 10.1108/13552510810877665 (Permanent URL) |
| Publisher: | Emerald Group Publishing Limited |
| Abstract: | Purpose – The purpose of this study is to propose and model an integrated production-maintenance strategy for unreliable production systems producing conforming and non-conforming items. Design/methodology/approach – The proposed integrated policy is defined and modeled mathematically. Findings – The paper focuses on finding simultaneously the optimal values of the lot size Q and the age T at which preventive maintenance must be performed. These values minimize the total average cost per time unit over an infinite horizon. Practical implications – The paper attempts to integrate in a single model the three main aspects of any manufacturing system: production, maintenance, and quality. It deals with the lot-sizing problem for a production system which may randomly shift to an out-of-control state and produce non-conforming units. The system is submitted to an age-based preventive maintenance policy. The effect of performing preventive maintenance on quality- and inventory-related costs is shown through a numerical example. Originality/value – The paper proposes an integrated model that links EMQ, quality and an age-based preventive maintenance policy. It is shown that performing preventive maintenance yields reduction in inventory- and quality-related costs. |
Downloadable; Printable; Owned
HTML, PDF (240kb)
To purchase this item please login or register.
Fill in an Order form to request this document from your librarian