To read this content please select one of the options below:

Influence of ground handling on turn round time of new large aircraft

Theo Horstmeier (Faculty of Civil Engineering, Delft University of Technology, The Netherlands)
Floris de Haan (KLM Royal Dutch Airlines, The Netherlands)

Aircraft Engineering and Aerospace Technology

ISSN: 0002-2667

Article publication date: 1 June 2001

1716

Abstract

This study focuses on handling times of turn round cycles and on the adjustments of airports and processes in order to get ready for the A380. Turn round time (TRT) is defined as the time spent between arrival and departure at a handling facility or gate. First, analyses were done on current aircraft handling processes and whether these could be used for the A380. The study then focuses on alternative handling methods for the A380, and recommendations are made.

Keywords

Citation

Horstmeier, T. and de Haan, F. (2001), "Influence of ground handling on turn round time of new large aircraft", Aircraft Engineering and Aerospace Technology, Vol. 73 No. 3, pp. 266-271. https://doi.org/10.1108/00022660110390677

Publisher

:

MCB UP Ltd

Copyright © 2001, MCB UP Limited

Related articles