Optimal Due‐date Assignment in an Assembly Shop

T.C.E. Cheng (Hong Kong Polytechnic, Kowloon, Hong Kong)

International Journal of Operations & Production Management

ISSN: 0144-3577

Article publication date: 1 February 1994

427

Abstract

Under intensified pressure from both domestic and foreign competition, today′s manufacturers must strive to keep delivery promises and reduce waste. This depends largely on a manufacturer′s ability to assign accurate and attainable due‐dates. Presents an analytical method of assigning optimal total work content (TWK) due‐dates that minimize the average amount of missed due‐dates in a dynamic job shop with assembly operations. The accuracy of the method is assessed through computer simulation of a hypothetical assembly shop with different job structures under various operating conditions. While it is generally more accurate for jobs with simpler structures, the simulation results indicate that, over a range of test conditions, the method is both simple and effective in assigning optimal TWK due‐dates for assembly shops.

Keywords

Citation

Cheng, T.C.E. (1994), "Optimal Due‐date Assignment in an Assembly Shop", International Journal of Operations & Production Management, Vol. 14 No. 2, pp. 31-42. https://doi.org/10.1108/01443579410053194

Publisher

:

MCB UP Ltd

Copyright © 1994, MCB UP Limited

Related articles