To read this content please select one of the options below:

Adjudication on JCT 81 contracts

Anthony C. Ensom (Regional Director, Bucknell Austin, London, UK)

Structural Survey

ISSN: 0263-080X

Article publication date: 1 September 1998

1107

Abstract

The purpose of the article is to highlight for adjudicators key issues arising under the JCT 81 standard form of building contract which need to be understood in order to reach adjudicator’s decisions. It discusses the responsibility for design and the certifying and valuing functions of the contract administrator and quantity surveyor under JCT 80 and compares them with the way they are dealt with in JCT 81. The employer’s requirements, the contractor’s proposals and the contract sum analysis together with the role of the employer’s agent in JCT 81 are explained. The article concludes with advice to adjudicators and comments on the apparent reduction of disputes under JCT 81.

Keywords

Citation

Ensom, A.C. (1998), "Adjudication on JCT 81 contracts", Structural Survey, Vol. 16 No. 3, pp. 130-135. https://doi.org/10.1108/02630809810232682

Publisher

:

MCB UP Ltd

Copyright © 1998, MCB UP Limited

Related articles