A demonstration heat pump
P.A. Hilton
(Director, P. A. Hilton Ltd, Southampton Airport)
124
Abstract
Thermometers were put in the refrigerant line at the four obvious points and two pressure gauges were added in the high and low pressure parts of the system.
Citation
Hilton, P.A. (1966), "A demonstration heat pump", Education + Training, Vol. 8 No. 3, pp. 128-130. https://doi.org/10.1108/eb015697
Publisher
:MCB UP Ltd
Copyright © 1966, MCB UP Limited