To read this content please select one of the options below:

Use of the New Engineering Contract in Hong Kong

JOHN HALLIDAY (The Royal Hong Kong Jockey Club, 1 Sports Road, Hong Kong)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 1 April 1995

495

Abstract

The introduction of the New Engineering Contract (NEC) in the United Kingdom came at a time when the Royal Hong Kong Jockey Club were embarking on major contract works. This new contract provided the type of simple, flexible document ideal for our organization, which seeks to enter into co‐operative joint ventures with contractors. This, however, has not been an example followed by other Employers in Hong Kong and this paper gives the author's views on the reasons for this and the prospects of a change in the future. The paper then summarises presentations by members of the Jockey Club's professional consultants and one of the Contractors at the Hong Kong NEC Conference. The Club's projects are described in detail, however, the timing of the paper in advance of completion of the two major projects prevents a final assessment of the use of NEC in Hong Kong.

Keywords

Citation

HALLIDAY, J. (1995), "Use of the New Engineering Contract in Hong Kong", Engineering, Construction and Architectural Management, Vol. 2 No. 4, pp. 307-315. https://doi.org/10.1108/eb021017

Publisher

:

MCB UP Ltd

Copyright © 1995, MCB UP Limited

Related articles