To read this content please select one of the options below:

A new generation software for construction scheduling and management

ASIM KARIM (Department of Civil and Environmental Engineering and Geodetic Science, The Ohio State University, 2070 Neil Ave. Columbus, OH 43210, USA)
HOJJAT ADELI (Department of Civil and Environmental Engineering and Geodetic Science, The Ohio State University, 2070 Neil Ave., Columbus, OH 43210, USA)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 1 April 1999

407

Abstract

The authors were motivated to overcome some of the limitations and shortcomings of the existing software systems for management of construction projects. The result is a new generation software system for CONstruction Scheduling, Cost Optimization, and Change Order Management, which is called CONSCOM. CONSCOM uses the recently patented Neural Dynamics model of Adeli and Park as its computational engine for construction cost optimization and advanced software engineering and object‐oriented programming techniques such as framework and pattern. This paper presents some of its recent and innovative capabilities and features. CONSCOM includes an Integrated Management Environment (IME) as its user interface for the effective control and management of construction projects. An example of a highway construction project is presented to demonstrate the unique modelling capabilities of CONSCOM that cannot be modelled by Critical Path Method (CPM) or CPM‐like networks.

Keywords

Citation

KARIM, A. and ADELI, H. (1999), "A new generation software for construction scheduling and management", Engineering, Construction and Architectural Management, Vol. 6 No. 4, pp. 380-390. https://doi.org/10.1108/eb021126

Publisher

:

MCB UP Ltd

Copyright © 1999, MCB UP Limited

Related articles