ESTIVATE: a model for calculating excavator productivity and output costs
Engineering, Construction and Architectural Management
ISSN: 0969-9988
Article publication date: 1 January 2000
Abstract
Hydraulic excavator cycle time and associated unit costs of excavation for given input estimating data, for machines operating in the UK construction industry, are predicted. Using multiple regression analysis, three variables are identified as accurate predictors of cycle time: machine weight, digging depth and machine swing angle. With a coefficient of determination (R2) of 0.88, a mean percentage error (MPE) of −5.49, and a mean absolute error (MAPE) of 3.67, the cycle time model is robust; this is further validated using chi‐square analysis and Pearson's correlation coefficient (on predicted and actual values of machine cycle time). An illustrative example of the model's application to determine machine productivity is given. The paper concludes with a spreadsheet model for calculating excavation costs (m3 and cost per h) which is able to deal with any combination of the three independent cycle time predictor variables and other estimator's input data.
Keywords
Citation
EDWARDS, D.J. and HOLT, G.D. (2000), "ESTIVATE: a model for calculating excavator productivity and output costs", Engineering, Construction and Architectural Management, Vol. 7 No. 1, pp. 52-62. https://doi.org/10.1108/eb021132
Publisher
:MCB UP Ltd
Copyright © 2000, MCB UP Limited